Content of: The Sinking of the Lacey V. Murrow Memorial Bridge || November 25, 1990
The Sinking of the Lacey V. Murrow Memorial Bridge November 25, 1990 | Kudos365 Historical series
Historical Background
The Lacey V. Murrow Memorial Bridge carried Interstate 90 across Lake Washington between Seattle and Mercer Island. When the original bridge opened on July 2, 1940, it was one of the world’s largest floating structures and an important engineering achievement. A conventional bridge was difficult to build across Lake Washington because of the lake’s considerable depth and the soft material beneath its floor. Engineer Homer M. Hadley proposed supporting the roadway on hollow reinforced-concrete pontoons anchored to the lakebed. The pontoons displaced enough water to support their own weight and the roadway above them.
The bridge was originally called the Lake Washington Floating Bridge. In 1967, it was renamed for Lacey V. Murrow, who had served as Washington State’s director of highways and helped advance the project. The bridge encouraged the growth of Mercer Island and communities east of Lake Washington by providing a direct highway connection to Seattle.Traffic eventually exceeded anything anticipated when the bridge was designed. Washington constructed a parallel floating bridge, later named the Homer M. Hadley Memorial Bridge, which opened in 1989. The original Murrow Bridge was then closed for an extensive renovation intended to widen its traffic lanes and convert it to one-way eastbound service.Causes and Setting
Causes and Setting
The Murrow Bridge consisted of a long chain of hollow concrete pontoons. Their enclosed compartments provided buoyancy, but that buoyancy depended upon keeping large quantities of water from accumulating inside them. Renovation crews removed the bridge’s sidewalks, which were integral parts of the original structure, using high-pressure water in a process known as hydrodemolition. This work produced contaminated wastewater that could not simply be released into Lake Washington. Some pontoon compartments were used for its temporary collection, and large construction openings were cut into the pontoons to provide access.
Other alterations affected the bridge’s ability to remove water. Some roadway drains had been severed during construction, allowing runoff to enter the pontoons instead of flowing safely away. Open access points also exposed the interior compartments to rain and waves.
During the Thanksgiving weekend of 1990, a powerful storm brought heavy rain and strong winds to the region. Water entered the bridge from several sources: the hydrodemolition work, rainfall, drainage through construction-altered systems, and waves washing through openings. The storm was the immediate trigger, but later engineering investigations determined that it was not the primary cause of the failure. The central problem was the accumulation of water inside pontoons that had been placed in vulnerable temporary conditions during renovation. The bridge’s age and general condition played comparatively minor roles.
Major Developments
Workers inspected portions of the bridge on Saturday, November 24, and attempted to pump water from the pontoons as conditions worsened. By the following morning, sections of the bridge were riding dangerously low in the lake. Once a pontoon contained enough water, its weight exceeded the buoyant force supporting it. The pontoon began to settle beneath the surface. Because the bridge’s pontoons and roadway were connected, the failure of one section placed enormous forces on adjoining sections.
On November 25, the bridge began to sag visibly. Its slow deterioration attracted news crews, and television viewers watched as the structure gradually broke apart. Sections of roadway tilted sharply while water poured into additional compartments. As individual pontoons sank, they pulled upon neighboring pontoons and the roadway connecting them. Massive sections rose at steep angles before disappearing beneath Lake Washington. Approximately 2,800 feet of the floating bridge—more than two-fifths of its pontoon-supported length—was lost.
Eight pontoons eventually sank, carrying much of the central roadway to the lakebed. The collapse also damaged anchor cables associated with the adjacent Homer M. Hadley Memorial Bridge, temporarily affecting the parallel crossing. The bridge had already been closed to traffic for renovation, and the progressive nature of the failure allowed workers to leave the endangered structure. No one was killed or injured.
Outcome
The sinking destroyed a substantial portion of the original 1940 floating bridge. Although its approaches and some fixed structures could be retained, the lost pontoons and roadway had to be replaced. Washington Governor Booth Gardner appointed an investigative panel to determine what had happened and to recommend safeguards for the state’s other floating bridges. Investigators concluded that water accumulation during construction was the primary cause. Hydrodemolition water, rainwater, and wave splash entered through construction openings and altered drainage systems until the pontoons lost their buoyancy.
The investigation emphasized that major work on floating bridges required procedures different from those used in ordinary highway construction. A floating bridge must be treated as both a transportation structure and a marine vessel. Temporary openings, drainage changes, water storage, weather exposure, and construction sequencing can alter its stability even when its permanent design remains sound.
The panel recommended greater use of independent technical reviews during major reconstruction projects. It also encouraged improved monitoring, clearer responsibility for temporary construction conditions, and stronger recognition of the specialized risks associated with marine structures. A replacement floating section was designed and built using the original bridge approaches. The reconstructed Lacey V. Murrow Memorial Bridge opened to eastbound traffic on September 12, 1993. Together with the parallel Homer M. Hadley Memorial Bridge, it restored the complete Interstate 90 crossing of Lake Washington.
Historical Significance
The sinking of the Murrow Bridge became one of the most memorable infrastructure failures in Washington history, partly because the collapse unfolded slowly and was broadcast on television. Images of the roadway bending, breaking, and disappearing into the lake made an otherwise technical engineering failure immediately understandable to the public.
The disaster demonstrated that a sound permanent structure can become dangerously vulnerable during renovation. Construction changes may temporarily remove protections upon which the original design depends. Water that seemed manageable in separate amounts became catastrophic when allowed to accumulate within interconnected pontoons. The event also corrected a common misunderstanding about engineering failures. The Murrow Bridge did not sink simply because it was old or because floating bridges were inherently unsound. It sank because renovation work altered its watertight condition and drainage while water was allowed to collect inside the pontoons.
Its lasting importance lies in the lesson that maintenance and reconstruction require the same disciplined engineering attention as initial design. Temporary conditions are still structural conditions, and the safety of major infrastructure depends upon understanding how every stage of work affects the complete system.